Showing posts with label Boxy Stars. Show all posts
Showing posts with label Boxy Stars. Show all posts

Sunday, July 24, 2016

Stash Report - July 24, 2016

It's not a UFO!!  I managed to both start and finish a quilt top in the same month!  The quilt top Boxy Stars by Bonnie Hunter is finished.  It was a fun project, and is an extra long twin.


I have also worked diligently on the other Bonnie Hunter top I started earlier in the month, Bricks in the Barnyard.  I am about half finished with the blocks, and have used the French braid border as my Leaders and Enders.  I hope to finish it the first week of August.

Next month, I will focus on free-motion quilting and try to get all of the quilts in my que quilted.  So for now, no change to my report.

                                 This Week             This Year
Used:                              0.00                   25.25
Purchased:                      0.00                    67.50
Net:                                 0.00                   42.25

Have a great week!
Joy :)

Linking up with Judy at Patchwork Times.

Sunday, July 17, 2016

Stash Report - July 17, 2016

Have you ever been getting ready for a retreat or special sewing time and thought, "I'm going to get so much done!  I better take extra!"?  That is exactly what I did last week.  My plan was to sew every day in the hotel room while my boys were at Space Day Camp.  My goal was to finish the two class quilts I started with Bonnie Hunter at the beginning of the month.  But surely I could get more finished, so I also packed Girls Just Wanna Have Fun, Floating Hexagons, my Christmas table runner, and a Scrap Bag for good measure.  It would be terrible to have to go "buy" a "new" project while on vacation, right?

Hahahahahaa!  Silly girl!  What was I thinking?  I did sew every day (and night) in the hotel room.  I did get quite a bit accomplished, but taking just the two class quilts would have been plenty.  While in the hotel, there were still "chores" to be done.  We had a nice room with a kitchenette, and I had planned crockpot meals.  I took most of the spices, but I still had to shop for the meat and veggies while I was there.  I still had a load of laundry to do, and I had to pick up the room each morning after my little tornadoes were done getting dressed.  (Yes, they are able to do this themselves, but time in the morning was a factor.)  There were also two trips to Unclaimed Baggage that needed to happen...that was half a day times two, and well worth it!  (I may never check another bag on an airline again!)

When I wasn't on those adventures, I was in the room sewing.  This was my little setup.  It was compact and efficient.  I really liked the layout, and I made notes in my Quilting Journal about what I liked and didn't like about the setup.  Eventually, I will redo my home sewing room, and these notes will be helpful.


I started by working on Boxy Stars.  Maybe I should have started with Bricks in the Barnyard, because I think I had all of those pieces cut out already.  That was not the case for Boxy Stars.  So I spent time cutting and marking those pieces before I could sew them.  I did manage to get all of the blocks done for the quilt while in the hotel.


When I arrived home yesterday, I also completed adding the sashing to the blocks and assembling them into rows.  Today, I need to complete the cornerstone/sashing rows and add borders.

As I look ahead to the next few weeks, I'll be traveling again.  I won't take my machine, so this week I need to prepare one of my embroidery projects to travel with me.  I only need one, because I am quite sure I will not be able to finish an entire block while I am gone.  Once I have that prepared, I will work on Bricks in the Barnyard.  My goal is to keep this from becoming a UFO, and focus on piecing the rest of July.  In August, the plan is to work on my free-motion by quilting the tops that are waiting.  There are four so far.

So no finishes to help my numbers, but no fabric shopping either.  I have made significant progress on completing this top, so hopefully I am getting closer to moving my numbers in the other direction.

                                 This Week             This Year
Used:                              0.00                   25.25
Purchased:                       0.00                    67.50
Net:                                 0.00                   42.25

See how others are managing their stash this week at Patchwork Times.

Have a great week,
Joy :)

Sunday, July 10, 2016

Stash Report - July 10, 2016

It's been a great week.  One of my Quilting Cousins came to visit with her grandson.  They played together well, while she and I talked and enjoyed time together.

And guests mean...cleaning the sewing room.  This was far less traumatic than normal.  The prior week I needed to get into the Closet of Doom to find batting.  To get to the closet, I had to move the cutting table.  To move the cutting table, I had to put everything else away. So this week, all I really had to do was straighten up around my machine, move the class bags from last week to under the cutting table, and vacuum.

Before and after they left, I have been working on Girls Just Wanna Have Fun.  I have now sewn and pressed all of the half-square triangles (HST) for the Churn Dash Blocks and started piecing the Nine-Patches as Leaders and Enders.  At one point during the week, I had sewn 15 chains of 11 HSTs, and had them laying on the ironing board.  My husband went in early one morning to iron a shirt, and came in to wake me up.  He said he was not going to try to move them, because he was sure he would make a mess.  I laughed at him, got up, moved them, and ironed his shirt for him.


On Saturday, we had a project day at guild.  I looked through my email, but didn't have cutting directions.  So I arrived with just a stack of Christmas fabrics.  I still managed to finish the tablerunner top, but I haven't yet quilted it.  (I have to go back into the Closet of Doom to find batting.) So I am close to another finish.


Today, I am going to finish packing for a trip.  Hubby will be staying here while I take the boys to Huntsville, AL for Space Camp.  I'll be staying in a hotel for the week, so I am taking my machine to quilt while the boys are at the camp.  To help with my quandary from last week, I decided to take my Featherweight with me, instead of my bigger machine.  That means piecing this week, instead of quilting.  My goal will be to finish the tops from last week's workshops with Bonnie Hunter, which are Boxy Stars and Bricks in the Barnyard.  Those pieces are already packed, and mostly cut.  I'm also going to pack up Girls Just Wanna Have Fun, in case I need extra to work on.  And if I have time to clear a path and get into the Closet of Doom, I'll take the batting and backing for the guild tablerunner.  I think I have all the right colors of thread, and it's very linear design could be quilted on my Featherweight.

No fabric was added this week, and I am excited that the fabrics for the tablerunner were all in my stash.  I actually picked out fabrics from my stash to make another one too.  No finishes this week either, but I'm getting close to having several.

                                 This Week             This Year
Used:                              0.00                   25.25
Purchased:                       0.00                    67.50
Net:                                 0.00                   42.25

Check out other Stash Smashers at Patchwork Times.

Have a Blessed Week,
Joy :)